Facilities/Equipment

Facilities/Equipment

We are concerned about the environment in which we operate; hence, we protect the environment by minimising pollution, reducing waste generation and contamination of air, water and land. All wastes generated during the cause of our operations are disposed of in an environmentally friendly manner.

We protect the health and safety of our staff, contractors, employees and all parties impacted by our activities.

Mega Workshop 14,400sqm of covered max overhead lift of 100 Tons • Plate Cutting machine capability of up to 300mm

Plate Rolling capacity of up to 130mm x 3000mm wide

Quayside 1.2 Km

Semi-Automatic Welding Equipment